Mining Symmetric Overburden Drilling Equipment with Rings for Construction

Product Details
Customization: Available
Customized: Customized
Standard: ISO9001
Shipping & Policy
Shipping Cost: Contact the supplier about freight and estimated delivery time.
Payment Methods:
visa mastercard discover JCB diners club american express T/T
PIX SPEI OXXO PSE OZOW
  Support payments in USD
Secure payments: Every payment you make on Made-in-China.com is protected by the platform.
Refund policy: Claim a refund if your order doesn't ship, is missing, or arrives with product issues.

360° Virtual Tour

Secured Trading Service
Diamond Member Since 2014

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Terms of Payment
LC, T/T, D/P, PayPal, Western Union
  • Mining Symmetric Overburden Drilling Equipment with Rings for Construction
  • Mining Symmetric Overburden Drilling Equipment with Rings for Construction
  • Mining Symmetric Overburden Drilling Equipment with Rings for Construction
  • Mining Symmetric Overburden Drilling Equipment with Rings for Construction
  • Mining Symmetric Overburden Drilling Equipment with Rings for Construction
  • Mining Symmetric Overburden Drilling Equipment with Rings for Construction
Find Similar Products

Basic Info.

Model NO.
COP / DHD /QL
Length
Stub-length
Type
Drill Bits
Material
Tungsten Carbide
Usage
Water Well, Geothermal Drilling
MOQ
1 PCS
Application
Water Well, Geothermal Well etc
Transport Package
Wooden Package
Specification
steel
Trademark
BESTLINK
Origin
China
HS Code
82071990
Production Capacity
50000 PCS / Month

Packaging & Delivery

Package Size
50.00cm * 60.00cm * 80.00cm
Package Gross Weight
100.000kg

Product Description

Symmetric Overburden Drilling Equipment

Symmetric Overburden Drilling Equipment is suitable for drilling water wells, geothermal wells, short mirco-piles,medium mini-type grouting hole of building, damand harbour project.

Applications:
Blast holes
Water supply wells
Bridge and building foundations
Standard slant or horizontal drilling
Mining air holes
Environmental monitoring wells
Grouting operations
Seismic shot holes
Soil sample and geotechnical applications
Ground anomaly and tiebacks
Storage caverns and dam


Features:
Casing drilling involves drilling and casing a well simultaneously through unstable ground conditions, In casing drilling process, down the hole tools can be retrieved, through the casing on wire-line, meaning tool recovery or replacement of tools can take minutes versus hours under conventional methods. This process employs wire line-retrievable tools and a drill-lock assembly, permitting bit and BHA changes, coring, electrical logging and even directional or horizontal drilling. Once the casing point is reached, the casing is cemented in place without tripping pipe.
 
Casing drilling has been employed in many countries as an effective method of reducing the overall drilling costs by reducing drilling time and drill string problems encountered during conventional drilling process.

Mining Symmetric Overburden Drilling Equipment with Rings for Construction

Operation Process:
1. Ring bit and casing shoe assembly is welded to casing prior to drilling. Lock the assembly into pilot bit with hammer. The pilot bit's upper shoulder engages the shoulder of the casing shoe. 


2. Hammer's percussive energy is transferred through the pilot and ring bits, crushing rock . Part of impact energy advances casing. 

3. On completion of drilling and casing , the drill string with pilot bit is retrieved by a slight reverse rotation to unlock the bayonet coupling . The ring bit stays in the hole , and can be recovered only if the casing is retrieved 

4. Drilling continues to the desired depth in the bedrock using a conventional drilling.

Technical Data: 
Casing tube
OD(mm)
Casing tube
ID(mm)
Reamed Dia(mm) Casing Shoe ID(mm)

 
Polit bit Dia(mm) Hammer shank
108 93-99 118 86 77 DHD3.5/QL30
114 102-104 127 91 82 DHD3.5/QL30
127 115-117 136 101 92 DHD3.5/QL30
140 124-128 152 117 105 DHD340/SD4/QL40/M40
146 130-134 154 117 105 DHD340/SD4/QL40/M40
168 148-156 185 140 125 DHD350/SD5/QL50/M50
178 158-166 195 150 140 DHD350/SD5/QL50/M50
183 163-171 193 154 144 DHD350/SD5/QL50/M50
194 174-182 211 166 150 DHD360/SD6/QL60/M60
219 199-207 237 193 165 DHD360/SD6/QL60/M60
245 225-233 260 210 190 DHD380/SD8/QL80/M80
273 253-257 308 241 220 DHD380/SD8/QL80/M80
325 305-309 348 281 205 SD10/NUMA100
406 382-388 440 364 340 SD10/NUMA100

 
Package for casing system:
Mining Symmetric Overburden Drilling Equipment with Rings for Construction

Mining Symmetric Overburden Drilling Equipment with Rings for Construction
 


 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier